MY TASKS — FROM THE FOREMAN
Checking…
Photo / Video → Job Record
Parts Request FOREMAN
Job Note / Issue
O2 SENSORS & LN2 SYSTEM — SUITE 100
GC CORRESPONDENCE · ARIZONA BUILDING CONTRACTORS O2 Sensor Layout
PHASE II · SENSOR LOCATIONS O2 Monitor Model 221R — Data Sheet
SPECS & RATINGS · 2 PAGES O2 Monitor Model 221R — Operator Manual
INSTALL · WIRING · CALIBRATION · 26 PAGES E-Stop Panels — Schematic
8 PAGES · 2024-01-31 E-Stop Controller LN2-1125
REV 4 MidWest Cryo — Wiring Scheme 1125D LN2 Shutoff Controller
MIDWEST CRYO · 8/15/2023 New Circuit — LN2 Tank Actuators
APPROVED LIGHTING — PHASE 2
ENGINEER-STAMPED 8/2024 · 51 PAGES · CHECK APPROVAL NOTES ON EACH FIXTURE (e.g. TROFFERS: SET 25W / 3500K)
ELEVATOR
DETAIL · 11/13/2025
PERMIT DRAWINGS
FULL SET · 2025-11-25 · OPENS IN DRIVE VIEWER (ALWAYS CURRENT)
ASK PM — CBR PROJECT MANAGER
I'm the AI project manager for CBR. Ask me about the drawings, the O2 system, fixture settings, the E-stop wiring — anything on this job. Tip: tap the mic on your keyboard and just talk.
FOREMAN BOARD — CBR
FOREMANJOB NOTES / ISSUES — FROM THE CREW
Loading…
Assign a task
OPEN TASKS — WHOLE CREW
Checking…
Loading…
Sending…